ACMV was engaged to project manage the removal of the existing gas fired boiler and heating water system for ventilation and swimming pool, and the removal of evaporative coolers as well as the provision of a new boiler for swimming pool heating, provision of new reverse cycle air conditioning, upgrade of control system, upgrade of […]
Month: October 2014
Curtin University, Building 100, Bentley Campus
The upgrade of the Digital Control System & the modifications to the air conditioning systems required the removal of the obsolete Staefa building management control system and provision of new Johnson BACnet control system, re-engineering the air distribution systems and air conditioning plant to improve internal temperature control and air quality, improve plant operation and […]
Curtin University, Bentley
Buildings 100 (Chancellery), 105 (Library) & Building 200 (John Curtin Gallery) This project involved the removal of the existing control systems associated with the air conditioning and mechanical ventilation and the provision of a new digital control system incorporating improved control logic resulting in improved space temperature control, improved operation and performance of the existing […]