Perth Esplanade Busport

Esplanade Busport

Initial investigation undertaken to report on the operation and performance of the air conditioning plant, which identified that the chiller had exceeded its economic life and the control system was obsolete. It was also identified that the building was operating under a significant negative pressure. ACMV was subsequently engaged to provide design, tender documentation and […]

Continue reading


Police Headquarters

Police Headquarters

Modified existing chilled water piping arrangement and upgraded the BMS digital control system to improve the energy efficiency of the chilled water plant. Early indications are that there was a 20 – 25% reduction in energy for the chiller plant compared to the same time in 2013. Also undertook a review of the monitoring system […]

Continue reading


Curtin University, Building 100, Bentley Campus

Curtin University - Building 100

The upgrade of the Digital Control System & the modifications to the air conditioning systems required the removal of the obsolete Staefa building management control system and provision of new Johnson BACnet control system, re-engineering the air distribution systems and air conditioning plant to improve internal temperature control and air quality, improve plant operation and […]

Continue reading