The upgrade of the Digital Control System & the modifications to the air conditioning systems required the removal of the obsolete Staefa building management control system and provision of new Johnson BACnet control system, re-engineering the air distribution systems and air conditioning plant to improve internal temperature control and air quality, improve plant operation and reduce energy costs.
Office 141 Rustic Gardens, Carramar WA 6031 |
Post PO Box 3421 Joondalup WA 6027 |
Contact P: 0417 172 339 F: 0407 993 428 E: info@acmvdesign.com.au |