ACMV was engaged by the City of Greater Geraldton to provide consultancy services for the design of new air conditioning and mechanical services for the Queens Park Theatre, Geraldton. \u00a0The project involved the removal of the existing air handling and chiller plant and the design and replacement of new air handling plant. \u00a0A new 500kWr […]<\/p>\n <\/div>\r\n <\/div>\r\n<\/div>
Initially engaged to review the replacement of the existing Building Management Control System for Joondalup Police Academy in 2014, ACMV was later retained\u00a0as Lead Consultant engaging architects, structural, electrical and hydraulic engineers for the design, documentation and project administration associated with the construction of a new central chiller plantroom and provision of associated chiller plant: […]<\/p>\n <\/div>\r\n <\/div>\r\n<\/div>
Initial investigation undertaken to report on the operation and performance of the air conditioning plant, which identified that the chiller had exceeded its economic life and the control system was obsolete. It was also identified that the building was operating under a significant negative pressure. ACMV was subsequently engaged to provide design, tender documentation and […]<\/p>\n <\/div>\r\n <\/div>\r\n<\/div>
Initial investigation into the performance characteristics and piping arrangement of the existing chiller plant and its electrical power supply to determine if an additional chiller could be provided to operate in lead \/ lag or duty \/ standby operation. The investigation found that the power supply excluded lead \/ lag operation unless extensive upgrade of […]<\/p>\n <\/div>\r\n <\/div>\r\n<\/div>
Modified existing chilled water piping arrangement and upgraded the BMS digital control system to improve the energy efficiency of the chilled water plant. Early indications are that there was a 20 \u2013 25% reduction in energy for the chiller plant compared to the same time in 2013. Also undertook a review of the monitoring system […]<\/p>\n <\/div>\r\n <\/div>\r\n<\/div>
ACMV was engaged to project manage the removal of the existing gas fired boiler and heating water system for ventilation and swimming pool, and the removal of evaporative coolers as well as the provision of a new boiler for swimming pool heating, provision of new reverse cycle air conditioning, upgrade of control system, upgrade of […]<\/p>\n <\/div>\r\n <\/div>\r\n<\/div>
The upgrade of the Digital Control System & the modifications to the air conditioning systems required the removal of the obsolete Staefa building management control system and provision of new Johnson BACnet control system, re-engineering the air distribution systems and air conditioning plant to improve internal temperature control and air quality, improve plant operation and […]<\/p>\n <\/div>\r\n <\/div>\r\n<\/div>